annem
2006-02-06 22:51:31 UTC
Can anyone give me a short overview of the steps needed to set up a PMO site
and one project site? I am very familiar with WSS and have read tons on SPS
and Project Server, but can't get the basics on how it should work. Like, do
I set up a Team Site for the PMO and then publish my 'Project 1' MS Project
Professional .mpp to that site? And it automatically creates a sub site for
Project 1 where I can set up Document Libraries and Lists? If this is the
correct flow, does this mean that when I set up 'Project 2' and publish it to
the PMO site, it will create another sub site? And, can the PMO Director
pull both of those project plans into one Master Plan? Thanks, Annem
and one project site? I am very familiar with WSS and have read tons on SPS
and Project Server, but can't get the basics on how it should work. Like, do
I set up a Team Site for the PMO and then publish my 'Project 1' MS Project
Professional .mpp to that site? And it automatically creates a sub site for
Project 1 where I can set up Document Libraries and Lists? If this is the
correct flow, does this mean that when I set up 'Project 2' and publish it to
the PMO site, it will create another sub site? And, can the PMO Director
pull both of those project plans into one Master Plan? Thanks, Annem